How it works

Waste Infrastructure as a Service

A processor should not need to purchase and operate expensive waste-processing equipment. OKIN provides the infrastructure, technology and operations.

Four stages

Assess. Deploy. Operate. Monetize.

01

Assess

We analyse your waste stream, volume, composition and processing requirements.

02

Deploy

We install modular processing infrastructure at or near the source of waste.

03

Operate

OKIN manages processing, monitoring, maintenance and operational performance.

04

Monetize

We commercialize recovered products and eligible environmental attributes.

Division of responsibility

You provide the waste stream. We provide everything else.

The customer provides access to its waste stream and site. OKIN operates the infrastructure and monetizes the resulting outputs.

OKIN provides

  • Waste assessment
  • Infrastructure design
  • Equipment deployment
  • Installation
  • Operations
  • Maintenance
  • Waste measurement
  • Processing
  • Output commercialization
  • Carbon measurement and MRV

Value flow

  1. Agricultural processor

  2. Agricultural waste

  3. OKIN infrastructure

  4. Processing

  5. Biochar + energy + recovered materials + carbon assets

  6. Revenue

  7. Shared economic value

Getting started

What an engagement looks like.

Every deployment starts with an assessment. We do not install equipment before the waste stream is characterised and the economics are understood.

  1. Enquiry

    You share volumes, feedstock and location

  2. Waste assessment

    Composition, volume, seasonality

  3. Design

    Infrastructure sized to the stream

  4. Deployment

    Installation and commissioning

  5. Operations

    OKIN runs and maintains the asset

  6. Reporting

    Performance, outputs and carbon data